What are the steps to install a hydraulic water well drilling rig?
2. Secondly, before determining the installation of the water well drilling rig, the topography, geology, hydrology, meteorology and flood level should be investigated.
3. According to the water well drilling rig at the horizontal site, the installation needs to install the drilling rig base, tower body, ground anchor, etc.
4. Flatten a solid part next to the predetermined orifice, the area should not be less than 53.3m2, the front of the wellhead may be uneven, but there should be no obstacles above 1m.
5. When the hydraulic water well drilling rig is equipped with a ground beam, the diesel engine transmission device and the hoist are fixed on the base of the drilling rig.